Bathroom Renovation Cost in 2026
Bathroom renovations run A$12,500 to A$46,500+. Here’s what each budget tier buys, where the cost hides, and how to keep a small room from becoming a big bill.
Updated July 10, 2026 · 7 min read
Bathrooms are small, but they’re dense with plumbing, tile, and waterproofing — which is why they cost more per square metre than almost any other room. A 2026 bathroom renovation typically runs A$12,500–A$31,000 with primary-bath gut jobs and additions passing A$46,500.
Here’s what each budget level buys, where the money goes, and how to avoid the two mistakes that blow bathroom budgets: moving plumbing and discovering water damage.
Cost by scope
Bathrooms scale with how much you change and how much plumbing moves:
- Cosmetic refresh (A$12,500–A$18,500): new vanity, toilet, fixtures, paint, lighting, and re-tiling a floor.
- Mid-range renovation (A$18,500–A$31,000): new tub/shower, tile surround, vanity, flooring, fixtures and ventilation.
- Full gut / primary bath (A$31,000–A$54,500+): new layout, walk-in or curbless shower, double vanity, premium tile and finishes.
Where the money goes
Labour is a bigger share here than in most rooms because of tile and plumbing:
- Labour: ~40–50% — tile setting, plumbing and waterproofing are skilled, time-intensive work.
- Fixtures and fittings (tub, shower, toilet, vanity, taps): ~25–30%.
- Tile and flooring: ~10–15%.
- Lighting, ventilation, paint and accessories: the rest.
Watch for these budget-killers
Bathrooms hide more surprises than any other room:
- Moving the toilet, shower or sink — relocating drains is expensive.
- Hidden water damage or mould behind old tile and around the tub.
- Outdated or unsafe wiring and no exhaust fan (now code in most areas).
- Going curbless or converting tub-to-shower — great features, but they add labour.
How to keep it on budget
As with kitchens, keeping the plumbing where it is saves the most money. Waterproofing is not the place to cut corners — a proper shower pan and membrane is what keeps a beautiful bathroom from rotting behind the walls in five years, so make sure your quote spells it out. Budget a 15% contingency for the water damage older bathrooms so often reveal at demo.
What’s different in Australia
Prices on this page are in Australian dollars and reflect typical national ranges; your state and city matter a lot. Sydney, Melbourne, Canberra and remote/regional areas sit at the higher end, and northern zones add cyclone and heat considerations.
By law, electrical and plumbing work must be carried out by a licensed tradesperson — unlicensed DIY on these is illegal and voids insurance. Most building work follows the National Construction Code and relevant Australian Standards, needs council/private-certifier approval, and attracts 10% GST. In homes built before the late 1980s, assume asbestos may be present and test before disturbing materials.
Bathroom Remodel cost by city
See location-adjusted bathroom remodel costs for your area:
Frequently asked questions
How long does a bathroom renovation take?
A cosmetic update might take 1–2 weeks; a full renovation 3–5 weeks. Tile, waterproofing cure times, and custom orders (vanities, glass) usually drive the schedule.
Is a tub or walk-in shower better for resale?
Keep at least one bathtub in the home for families with young children; beyond that, a large walk-in shower is increasingly what buyers want in a primary bath.
Can I renovation a bathroom myself?
Cosmetic swaps (vanity, paint, fixtures) are DIY-friendly. Plumbing relocation, waterproofing, tile, and electrical are where mistakes get expensive and leaky — those are worth a licensed pro.
What adds the most value?
Clean, modern, well-lit and — above all — leak-free. A neutral, quality finish with good ventilation and lighting beats trendy choices that date quickly.